Raw aluminium
The factory

From solid aluminium to your frame.

No warehouse and no batch production. Every Hiisi is machined after your consultation and built to order in Jyväskylä.

24 hof CNC machining per frame
100 kg → 3 934 gsolid aluminium to finished frame
7 stagesaerospace bonding process
Since 2013designed and built in Jyväskylä
Machining

Cut to ±0.05 mm.

Around 24 hours of CNC machining turns 100 kg of solid aluminium into a 3 934 g frame. When the manufactured geometry matches the CAD model within ±0.05 mm, the simulation you trust is the bike you ride.

CNC machining
Bonding

Aerospace adhesive. Seven-stage process.

Structural adhesive bonding is the standard joining method in aerospace and Formula 1. It spreads load across the whole joint instead of concentrating it, and leaves no heat-affected zone. The seam between the two machined halves is invisible to the naked eye.

Bonded linkage detail
Finish

E-coated in-house. No paint.

Three e-coat finishes: Raw Silver, True Gold, Hero Bronze. Each one goes on our own line. The e-coat seals every surface, inside the cavities too, against corrosion.

Finished frame, Raw Silver e-coat
Pole factory

Made for one rider. Yours.

Every frame is machined to a single person's measurements.

Start your build →

Not ready yet? Stay close.

New models, limited releases and factory stories. No spam.